Solveig Multimedia Forum - Get help for video editing software
		SolveigMM End-User Products => Video Splitter => Topic started by: Hobedtor on December 16, 2018, 11:28:19 PM
		
			
			- 
				I cut many vids and it costs much time to find the right places. Solveig Video cutter has no comfortable forward function, so I do forwarding with a player. (VLC) 
 Here I can forward without skipping any scene until 16times speed.
 The Problem: I have to adjust the location in VS after I found one right location with the player.
 Any idea how to syncronise the playbacktime of the player with the playbacktime of VS with one click?
 
 thanks
 
- 
				Hello Hobedtor,
 
 I suppose the only way is to enter the correct time manually into the Video Splitter navigation edit box. But please keep in mind, that by default it has a time;frames format and the last digits represent a number of frame rather than milliseconds value.